How far ahead to book each type of tradesman

Short answer when hiring . Book minor repairs 1–2 weeks ahead. Book cosmetic renovations 2–4 weeks ahead. Book kitchens, bathrooms and multi-trade projects 8–12+ weeks ahead, then confirm dates in writing.

This guide helps homeowners, tenants, strata managers and small business owners plan home repairs and renovations in Australia with professionalism and confidence. You will see typical tradie lead time by trade, when demand spikes, and the right renovation schedule so every tradesman arrives on time. Pre-Christmas slots can fill 3–6 weeks early, so the earlier you plan, the better your price and choice.

When should I book a tradie for a renovation

Start 4–8 weeks ahead for minor renos and 8–12+ weeks for multi-trade projects, then confirm dates in writing.

Cosmetic updates such as paint, lighting swaps or a handyman patch and cleaning pass fit in 2–4 weeks. Kitchens and bathrooms need 6–10 weeks due to design, approvals and materials. A full renovation with construction changes, structural work or custom joinery needs 8–16+ weeks and the right tools.

Lock the right tradespeople in this order. Structural or builder, then electrical and plumbing rough-ins, then linings and finishes, then fit-off and compliance. Put dates on a simple timeline so everyone is on the same page. If you do not already have a local tradesman, browse by trade and suburb in the Directory: https://www.tradeheroes.com.au/directory. Users often search online platforms to find local tradesmen.

Which tradies get booked out the fastest

Electricians, plumbers and tradespeople book first, followed by tilers and painters in peak seasons.

Compliance work and emergencies soak up diaries, yet it's essential to expect quality service. Storms push roofing and electrical callouts. Heat waves spike air conditioning. There are fewer waterproofers and tilers, so they slip out by 2–4 extra weeks in spring and summer.

Regional areas add travel time, so a local tradesman with the right skills can reduce delays.

Tip. Ask to join a cancellation list. You can move forward if another customer shifts a job. Watch the News page for local demand trends and weather notes: https://www.tradeheroes.com.au/news.

How far in advance do electricians usually book

To facilitate informed decisions, allow 1–3 weeks for small tasks and 3–6 weeks for renovation work. Emergencies are same-day at a premium.

Typical tasks and windows.

• New power point or light swap. 1–2 weeks.

• Switchboard upgrade with inspection. 3–5 weeks.

• EV charger install. 2–4 weeks, longer if meter changes are needed.

• Whole-house electrical rough-in. 4–6 weeks.

Licensing and inspection windows affect dates. Send photos, switchboard labels and a one-line scope to speed quoting and finalize contracts . If you need a Perth example, see Kings Electrics: https://www.tradeheroes.com.au/directory/kings-electrics.

Lead time for booking a plumber in Perth

Plan 1–2 weeks for maintenance and 3–5 weeks for renovation plumbing. Burst pipes and hot water get same-day priority.

Winter brings hot water failures and storm-driven plumbing leaks, highlighting the need for proper resources. Summer adds outdoor taps and irrigation. Help the team assess your site fast. Send fixture counts, brand names, under-sink photos, access notes and whether the job is a one-off job or part of a larger project. Plan for potential delays due to weather, council approvals, or material shortages. A reliable Perth example is Yes Plumbers.

What’s the busiest time of year for tradies

Pre-Christmas (Oct–Dec) and late summer heat are peak. Long weekends and public holidays compress schedules.

Trade-specific spikes.

Air conditioner install and cooling faults. Dec–Feb.

Roofing and gutters. Late winter to spring.

Plumbers. Winter storms and pre-Christmas.

Painters. Spring and early summer.

Carpenters and cabinetry. Spring to pre-Christmas.

Check WA public holidays and school holidays. Diaries shrink by 1–2 business days each short week. During peaks, add 2–4 extra weeks to every booking. For market insights and small business tips, see Business: https://www.tradeheroes.com.au/business.

How to schedule trades for a home renovation project

Sequence structural first, then rough-ins, then linings and finishes, then fit-off and compliance checks.

Simple order to copy.

  1. Demolition and strip-out
  2. Framing or structural changes
  3. Plumbing rough-in
  4. Electrical rough-in
  5. Linings, plaster, render and gyprock
  6. Waterproofing and certification gate
  7. Tiling and stone
  8. Carpenters for cabinetry and doors
  9. Painting
  10. Floor coverings
  11. Fit-offs. Taps, toilets, lights, appliances
  12. Testing, certificates, final clean

Hold short gaps between stages. Example. Waterproof needs 24–48 hours cure before tile. Keep a paper and email trail so responsibilities are clear. Put compliance gates in the plan. Electrical safety, waterproof sign-off and smoke alarms are not optional.

Do tradies work on short notice

Yes for emergencies and small gaps. Expect after-hours fees or limited scope. Bigger jobs need lead time.

Same-day callouts come with a callout plus an hourly rate. Minimum charges apply. Be flexible on time windows. Have materials on site to remove delays. For urgent repairs, an electrician might be available within a few days. If you need a fast solution, try Lightning Electrical and ask to be added to the gap list: https://www.tradeheroes.com.au/directory/lightning-electrical.

Can you book multiple tradies at once

Yes, but assign one coordinator and avoid double-booking the same space. Confirm dependencies in writing.

Use a shared calendar or a one-page Gantt view. Mark access windows and who holds keys. Stagger dusty tasks and protect finished surfaces. Hold a 5-minute daily check-in during active phases so every tradesperson knows today’s process and tools on site. If you want help coordinating, It is best to confirm with the tradesperson that they will have enough time to dedicate to your project.

Is there a preferred order for booking trades

Book a builder or project service first when structure changes. Then lock electrical and plumbing, then finishing trades. Always ask about the tradesperson's current workload and how long they anticipate the job will take.

Model sequence to ensure a high standard .

• Minor reno. Painter, then electrician for fittings, then plumber for fit-off, then cleaner. 2–6 weeks total.

• Bathroom reno. Demolition week 1. Rough-ins week 2. Waterproof week 3. Tiling week 4. Fit-offs and paint week 5–6.

Permits and engineering come first where required. Allow 2–10 days for quotes and 1–2 weeks for special orders.

How to plan ahead for seasonal tradie demand

Shift non-urgent work into shoulder seasons and book peak trades 2–4 weeks earlier than usual to manage your budget.

Season table at a glance.

SeasonPeak tradesPlan ahead tips
SummerAir conditioning, roofing, electrical faultsBook installs 4–6 weeks early. Shade work early mornings.
AutumnRoofing, gutters, plumbing maintenanceBook 2–3 weeks early. Clear roof access.
WinterHot water, leaks, heating checksKeep parts on site. Book 2–4 weeks.
SpringPainters, tilers, carpentersBook 3–6 weeks. Order tiles and doors early.

Order long-lead items early. Tiles, fixtures, custom doors, glass and appliances can add 2–8 weeks. Plan around long weekends and public holidays so your team stays on track.

Lead times by trade

Use this as a baseline. Add 2–4 weeks during peaks or where materials are special order.

TradeTypical lead timePeak adjustmentNotes
Electrician13 weeks small, 36 weeks renos+23 weeksCompliance checks can add a day.
Plumber12 weeks maintenance, 35 weeks renos+13 weeksHot water same-day at a premium.
Roofer24 weeks+24 weeksWeather windows drive dates.
Tiler36 weeks+34 weeksFollows waterproof sign-off.
Painter24 weeks+26 weeksSpring surge.
Carpenter/Joiner25 weeks+24 weeksCustom joinery adds 48 weeks.
Plasterer/Renderer13 weeks+12 weeksCure times between coats.
Air-con installer24 weeks+46 weeksSite power and pad ready speeds install.
Glazier12 weeks+12 weeksSafety glass orders add days.
Bricklayers25 weeks+23 weeksDependent on block supply.
Floor layers24 weeks+23 weeksAcclimatisation may add 48 hours.
Handyman12 weeks+12 weeksBundle tasks to save.
Cleaner (build clean)37 days+710 daysBook before handover.

These are guides. Other factors change timing. Weather, strata approvals, supplier delays and property access can affect every hour on your plan. Online platforms often have star ratings to gauge a tradesman's reliability and quality of work. Many homeowners rely on online reviews to assess a tradesman's reliability before hiring them. Reliability builds trust with clients and ensures project success.

Rights, insurance and deposits at booking

Work with licensed, insured qualified professionals and keep everything in writing. It's vital to ensure that every tradie you hire is licensed for the specific work they will be doing. Checking a tradesman's past customer reviews is important when hiring them. Most homeowners prefer to check recommendations from previous customers when choosing a tradesman. Hiring a tradesman with verified reviews and a strong reputation can lead to a better overall experience.

Ask for licence numbers where relevant and public liability insurance certificates. That insurance coverage protects you if accidental property damage occurs, reinforcing the importance of a good reputation . Keep contracts and a written schedule. Under Australian Consumer Law, services must be delivered with due care, skill and a high standard, fit for purpose and within a reasonable time. Reasonable deposits are fine, but you should not be paying for full materials months ahead without clear delivery dates. Public liability insurance protects you and your property in case of an accident or injury caused by the tradesman. This gives you financial protection if the business cannot deliver. Getting three or more quotes helps homeowners compare prices and services efficiently. A good tradesman will have a reputation for delivering high-quality work, as evidenced by positive reviews.

Mini checklist before you book

  1. Define scope in one paragraph.
  2. Share photos, plans and measurements.
  3. State location, access and parking.
  4. Offer 2–3 date windows.
  5. Ask for lead time, hourly rate or fixed price, and what is included.
  6. Confirm licence, insurance, and warranties.
  7. Get a target start week and estimated timeline in writing.
  8. Keep a single coordinator so communication stays clear. Written, itemized quotes are crucial for accountability when hiring a tradesman. Attention to detail ensures that the job is done correctly, saving time and money in the long run. Excellent customer service skills lead to satisfied clients who are likely to return for future work.

FAQs

What counts as an emergency that justifies after-hours can make a significant difference.

Anything that risks safety or damage, such as power loss, a gas smell, an active water leak or a door that will not secure. Call first, then text photos. Expect after-hours rates on nights, weekends and public holidays.

How do I hold a tentative date without paying a deposit

Ask for a pencil booking with a decision date and a written quote to ensure quality work. Some trades hold 48–72 hours. If you accept, sign and pay the agreed deposit.

What should I include in a booking message so I get a fast response

Include suburb, photos, scope in one line, two time windows and whether access is clear. Add brand and model for appliances or an air conditioner.

How long should I wait before I follow up

Wait one business day for quotes and 30 minutes for emergencies. Send one concise follow-up, watch for responses not a burst of messages.

Can I change dates after materials arrive, and what assistance can I expect?

Yes, but you may pay a rebooking fee or storage. Once goods are delivered or customs, changes can cost money and add weeks.

Need verified, licensed tradies

Find qualified, trustworthy local tradies for your postcode. Compare availability, confirm licences and request dates in one place.
CTA: Learn how we verify tradies → About us
Cost and pricing guides
Guides
Resources
House Painting Cost Guide 2025
How Much Do Blinds Cost in 2025
Window Replacement Cost: A Complete Guide
How Much Does Carpet Cleaning Cost in Australia 2025
Garage Door Repair Cost 2025

Loading sponsors...